Observing Sawyer Flood Plan
|
Video
Jenny Castro | 8/9/2012
In Sawyer, they`re still recovering from the waters that breeched their levees last summer. They are also looking for help from FEMA to put a long term flood recovery plan in place.
Congressman Rick Berg met with town leaders and the Minot City Engineer to figure out the short term and long term needs.
"Obviously, meeting with the commission members you can see there`s a very strong desire and concern that we need to protect our community long term, both from the water and ensure that we have access to transportation,” he said.
During the flood, the Corps of Engineers spent one million dollars for temporary levee construction in Sawyer and $500,000 in Velva.
BACK TO NEWS | BACK TO MINOT STORIES
Share Story
LATEST NEWS
|









